
A Week‑Long Race: Building Da Nang’s Dragon Bridge Water Show
Cuộc đua 7 ngày: Xây dựng màn trình diễn nước cầu Rồng Đà Nẵng
Nguồn: Vietnamnet
Da Nang’s Dragon Bridge dazzles tourists each weekend with fire and a spectacular water jet. The behind‑the‑scenes story shows how engineer Phan Dinh Phuong turned a one‑week deadline into a lasting attraction.
In early 2013, Phuong had just over a week to design and install the water‑spouting system for the bridge. He devised a custom hydropneumatic water‑mist solution that required a steel tank more than 3 m in diameter and over 10 m long to hold both water and compressed air.
Because no local company could build the tank, Phuong worked with a university lecturer to fabricate it, then coated the steel with heated bitumen for corrosion protection. The massive tank was moved at midnight and lifted into place beneath the bridge using two cranes.
Phuong used the city’s clean water supply to avoid river rubbish and protect visitors. A three‑piston air compressor pressurised the tank, sending a jet over 250 m that turned each cubic metre of water into roughly 1,300 cubic metres of mist.
The result was a powerful, misty water jet that has become a signature part of the bridge’s weekend shows. Phuong’s rapid, inventive engineering proves that tight deadlines can still produce safe and impressive public spectacles.
Bạn đã đọc xong bài này
Từ trong bài này
9 từ gợi ý · 0 từ đã tra
Từ gợi ý
Từ bạn đã tra
Bạn chưa tra từ nào trong bài này.
Luyện tập bài này
Luyện tậpĐọc tiếp
- Editor's PickCông việc · B1 · 1 phút đọc
The "Niche Advantage" in a Saturated Job Market
Lợi thế thị trường ngách giữa thị trường lao động bão hòa
- Editor's PickCông việc · B1 · 1 phút đọc
Navigating Career Anxiety in the Age of AI
Kiểm soát nỗi lo sự nghiệp trong kỷ nguyên trí tuệ nhân tạo
Latest NewsCông nghệ · A2 · 1 phút đọcSupermarket Fridge Hack Causes Food Waste and Worries Shoppers
Tin tặc tấn công hệ thống làm lạnh siêu thị, gây lãng phí thực phẩm