
New Ben Thanh–Can Gio Railway: Key Facts
Tuyến đường sắt Bến Thành – Cần Giờ: Những thông tin chính
Nguồn: Tuoitre
The Ben Thanh–Can Gio railway is a new rail line planned for Ho Chi Minh City. It will connect the city centre with the coastal area of Can Gio, helping people travel faster.
VinSpeed High‑Speed Rail Investment and Development JSC said it will start construction on 30 October 2024. The work will include the railway line, tunnels, elevated sections, Ben Thanh and Can Gio stations, a depot, and a control centre.
The line will be about 54 km long, have double tracks with the standard 1,435‑mm gauge, and be fully electrified. An underground part of about 3.3 km runs from Ben Thanh Station to km 3+173; the rest will be on viaducts. The project should finish by December 2029.
The construction will be done by a consortium. The consortium includes SGC Investment and Construction JSC as the lead member, Vinhomes JSC, and CONINCO will supervise the work.
The railway will be about 54 km long, fully electrified, and should be finished by December 2029. When it opens, it will give Ho Chi Minh City a modern, fast transport link to the coast.
Bạn đã đọc xong bài này
Từ trong bài này
6 từ gợi ý · 0 từ đã tra
Từ gợi ý
Từ bạn đã tra
Bạn chưa tra từ nào trong bài này.
Luyện tập bài này
Luyện tậpĐọc tiếp
Latest NewsXã hội · A2 · 1 phút đọcWhy Thuan An Ward Stops New Tombs
Vì sao phường Thuận An cấm xây mộ mới
Latest NewsKinh doanh · A2 · 1 phút đọciPhone Duo shortage pushes prices up and brings fraud risk in Vietnam
iPhone Duo khan hiếm đẩy giá tăng vọt, tiềm ẩn rủi ro lừa đảo tại Việt Nam
Latest NewsCông nghệ · B1 · 1 phút đọcWhy Ho Chi Minh City Needs AI and Institutional Reform to Keep Growing
TP.HCM cần AI và cải cách thể chế để duy trì tăng trưởng